Home » Shop » hot sale » 3m Charger for IPhone 17/16/16E/15, [2Pack]20W Fast Charging Cable USB C to USB C, Charger Cord UK Plug Adapter Long Lead for IPhone 17 Air/16 Pro

3m Charger for IPhone 17/16/16E/15, [2Pack]20W Fast Charging Cable USB C to USB C, Charger Cord UK Plug Adapter Long Lead for IPhone 17 Air/16 Pro

Original price was: $26.02.Current price is: $18.03.

Sale!

96 in stock

SKU: YL25568481 Category:

USB C to USB C Charger Cable 3m

Product Intraduction:

Brand: MCCRH
Color: White
Length: 3 Meter
Charging protocolPD 3.0
Maximum transfer speed480Mbps
Maximum charge speed5A/60W
Power Adapter: 20W
NoteThis product is suitable for mobile phones with USB C Port

This 3m usb-c to usb-c charger cable has a built-in efficient charging chip that supports fast charging with the PD protocol, allowing it to quickly charge your devices.

iPhone 16/15 lead can fast charge your iPhone 17/16/15 Series to 80% in 30 minutes.

iPhone Devices:

– iPhone 17 / 17 Air / 17 Pro / 17 Pro Max
– iPhone 16 / 16 Plus / 16 Pro / 16 Pro Max / 16E
– iPhone 15 / 15 Plus / 15 Pro / 15 Pro Max

iPad Pro Devices:

– iPad Pro 12.9-inch (3rd, 4th, 5th, 6th generation)
– iPad Pro 11-inch (1st, 2nd, 3rd, 4th generation)
– iPad Air (4th, 5th generation)
– iPad mini (6th generation, 7th generation)
– iPad (10th, 11th generation)

Google Phone Series:

– Google Pixel 10 Pro XL/10 Pro/10/10 Pro Fold
– Google Pixel 9 Pro XL/9 Pro/9/9 Pro Fold
– Google Pixel 8a/8/8 Pro, Google Pixel 7a/7 Pro/7
– Google Pixel 6a/6 Pro/6, Google Pixel 5a/5/4a/4 XL/4
– Google Pixel 3a/3 XL/3/2 XL

Samsung Galaxy Series:

– Samsung Galaxy S23 / S23+ / S23 Ultra
– Samsung Galaxy S22 / S22+ / S22 Ultra
– Samsung Galaxy S21 / S21+ / S21 Ultra
– Samsung Galaxy Note20 / Note 10
– Samsung Galaxy Z Flip /5G / 3 / 4 / 5 / 6
– Samsung Galaxy Z Fold /5G / 3 / 4 / 5 / 6

Note

This usb-c to usb-c charging cable 3m can only charge at the maximum output current with 5A.

To achieve fast charging, you need a charger for fast charging and you device must support fast charging.